22" Two Roll Rubber Mixing Mill Machine For Rubber Compounding ISO
Product Overview
22" Hardened Gear Reducer Two Roll Rubber Mixing Mill for professional rubber compounding applications. This industrial mixing mill is designed for efficient processing of rubber materials with precision and reliability.
Applications
- Milling process of rubbers and rubber products
- Mixing raw rubber with chemicals and additives
- Heating, pressing, breaking, and plasticizing rubber materials
- Processing thermoplastic or ethylene-vinyl acetate compounds
- Feeding material to downstream equipment like calenders, coolers, extruders, and vulcanizing presses
Machine Specifications
| Model |
Roll Size |
Speed Ratio |
Power (kW) |
Dimensions (mm) |
| XK-160 |
φ160x320 |
1:1.37 |
5.5 |
1500x750x1500 |
| XK-230(AZ) |
φ230x600 |
1:1.19 |
15 |
2800×1200×1120 |
| XK-250(AZ) |
φ250x620 |
1:1.17 |
18.5 |
3400×1500×1650 |
| XK-300 |
φ300x750 |
1:1.25 |
22 |
3500×1600×1700 |
| XK-360 |
φ360x900 |
1:1.25 |
30 |
3780×1850×1750 |
| XK-400 |
φ400x1000 |
1:1.27 |
37 |
4350×1850×1785 |
| XK-450 |
φ450x1200 |
1:1.27 |
55 |
5200×2380×1840 |
| XK-560(AZ) |
φ560x1530 φ510x1530 |
1:1.2 |
90 |
5845×2284×1978 |
| XK-550B |
φ550x1500 |
1:1.22 |
110 |
5870×2475×2045 |
| XK-610 |
φ610x2000 |
1:1.17 |
160 |
7070×2290×1840 |
| XK-660 |
φ660x2130 |
1:1.24 |
245 |
7465×3662×2080 |
| XK-710 |
φ710x2200 |
1:1.09 |
280 |
7500×3500×1800 |
Frequently Asked Questions
Delivery time of the Batch Off Rubber Cooling Machine?
This is specially designed machine according to your specific requirement. From engineer designing to production completion, it needs about 35 to 45 days.
What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production. Every machine will be fully assembled and carefully tested before shipment.
What's the machine quality guarantee?
Quality guarantee time is two years. We choose world famous brand components to keep our machine in perfect working condition.
Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation. Small machine usually takes within 3-5 days. Big plant usually takes about 30 days.
How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order. At the same time, we regularly send the production schedule and machine photos during the production process. The core of our company culture is innovation, quality, integrity and efficiency. Also we have had many good cooperation with world famous rubber production manufacturers.
How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao liuting airport. We will pick up you at the airport.
Additional Machinery
Our company specializes in manufacturing rubber mixing mills, rubber vulcanizing presses, rubber kneaders, batch off rubber cooling machines, and tire recycling lines.